As part of the redevelopment of London Bridge Station, Lindner Prater was appointed by Costain for the design, supply and installation of the pre-cast concrete platforms and roof canopies – consisting of aluminium cladding with aluminium standing seam roofing – as well as a bespoke structural glazing package.
Defined by its curvilinear canopy and stunning triple-height atrium and in the shadow of The Shard, the new London Bridge Station forms a vital connection point between London’s home counties and the capital.
In this video, we highlight how by adopting modern methods of construction and utilising its trusted supply chain, Lindner Prater ensured the successful delivery of London Bridge on time to Network Rail.