Open Navigation Close Navigation
Stadia & Leisure Icon
Client
Arsenal Football Club
Year
2005
Architect
HOK Sport
Main Contractor
Sir Robert McAlpine Ltd
Sector
Stadia & Leisure

Scope of Works Expand

  • Single ply waterproofing
  • Soffit tray system
  • Walkways and step-overs
  • Fascias
  • Polycarbonate sheeting

Overview Expand

Lindner Prater designed and installed a safety net fall and arrest system, which was dramatically suspended from the front to the back of the stadium during construction. 

For the integrated roofing structure, we created an aluminium mill finish soffit tray system to accommodate the PA system and bowl lighting. As each section of the soffits was installed, we fixed a metal deck to the top flanges of the structural steel beams followed by plywood decking.

A Sarnafil single ply membrane manufactured in a special RAL colour to specification was then installed to fully waterproof the roof. We also designed and installed aluminium bullnoses and fascias to pitch side and external elevations, which included the provision of secondary steelwork.